Featured project

The great work we did

Composite Girder

Composite Girder

Completed, Construction,

Other project

Ahmedabad-Dholera Copy

Project:- Construction and Commissioning of ROB at Ch.- 225+655 on Banihal-Baramula section. Span - 48.0...

Ahmedabad-Dholera

Project:- Construction and Commissioning 2X62m BSG at Ch. 5+700 on the Four Lane Expressway from...

ROB

Project:- Construction and Commissioning of 2X82-meter Bow String Railway Over Bridge (ROB) on the proposed...

Commissioning of 36mX4 Composite Girder Span

Construction & Commissioning of 36mX4 Composite Girder Span in Rehabilitation and Upgrading of Existing 2...

Composite Girder

Construction and Commissioning of Composite Girder 2X45-meter Span in Development of Six-Lane access controlled in...

Composite Girder 48-meter

Construction & Commissioning of Composite Girder 48-meter Span in Development of Six-Lane access controlled in...